Where can companies find information on the supportable equipment?
For EEG (Base)
The list of EEG (Base) equipment supported can be found on GoBusiness.
For EEG (Advanced)
Installation/Purchase of the following would not be supported under EEG (Advanced).
- Vehicles
- Key equipment in systems4 that require Measurement & Verification at system level for legislation compliance or Green Mark Scheme (or equivalent government scheme)
- Blackbox solutions (i.e. software or hardware devices whose functioning cannot be explained by applying mainstream engineering knowledge and theories for EE improvements)
- Non-EE equipment, including monitoring devices and equipment that reduce carbon emission but does not reduce energy consumption (e.g. solar PV Panel, wind turbine)
- International vessels
4 For chilled water plant retrofit that shall comply with the National Environment Agency’s (NEA) Minimum Energy Efficiency Standards (MEES), EEG (Advanced) can support chilled water system replacement/new installation that (1a) can meet or exceed MEES performance standard before MEES comes into effect; or (1b) exceed MEES performance standard after MEES comes into effect, whichever applies at the point of the first EEG (Advanced) submission; and (2) is installed with M&V sensors/meters to facilitate post retrofit system efficiency determination for compliance with MEES. The cost of M&V sensors/meters cannot be funded under EEG (Advanced). Applicant can refer to the third-party assessment form for details.
This information is sourced from GB